Accepted April 2025
A college with two campuses
Two campuses joined by an encrypted site-to-site VPN. Server access between the sites was tested and passed.
Case study · Firewall and Wi-Fi
Seafood processor
Firewall and Wi-Fi, one site
Metro Manila, Philippines
A seafood processor in Metro Manila engaged LMI to put a protected firewall and Wi-Fi network in place for its plant. The work was accepted in March 2025.
LMI set up separate access for each group of users, secure remote access to servers and protection on every enrolled device, then tested it all before handover.
On recordSigned acceptance test, overall result Passed.
Planned the internet connections, network segments and who can reach what.
Set up the firewall with both internet connections, addressing, segments, group policies and traffic shaping.
Turned on threat protection, loaded endpoint protection licenses, and set up a client VPN and Wi-Fi sign-in.
Tested VPN access, segments, addressing and speeds, then a signed acceptance test and certificate.
Site challenge
How access is organized
Schematic, not to scale. Names withheld.
On recordSigned by two client representatives and LMI, 27 March 2025. Overall result: Passed.
Accepted April 2025
Two campuses joined by an encrypted site-to-site VPN. Server access between the sites was tested and passed.
Accepted November 2023
A cloud-managed firewall installed and configured, with network segments, application rules and alerts.
Digital transformation requires solid infrastructure.
Every new system depends on the infrastructure beneath it. LMI builds that foundation so your team can find it, maintain it and trust it.
Staff, VIP users and IoT devices each get their own rules on one network.
ProofGroup policies set; addressing tested per segment.
Your team reaches servers from outside over a secure client VPN.
ProofServer access over the VPN tested and passed.
Threat protection on the firewall, and endpoint protection on your devices.
Proof35 endpoint protection licenses loaded.
Your team signs the acceptance test before you depend on the network.
ProofSigned acceptance, overall Passed, March 2025.
Also from LMIThe rest of the infrastructure a digital operation runs on: Network refresh · Fiber optic cabling · Structured copper cabling · Core switching · Managed CCTV · Access control and turnstiles · Lightning protection · Electrical works · Turnkey infrastructure projects
Is your network ready for what’s next? Start with a survey.
Contact us at lori@onelmi.comClient and site names withheld. Product names are trademarks of their owners.
LMI Corporation · Bacolod City, Negros Occidental, Philippines